Zone 7 Water Agency M&I Connection Fee

Levied by Zone 7 Water Agency (Zone 7 of the Alameda County Flood Control and Water Conservation District) on new development in Dublin. Authorized under the Gov. Code Sec. 66013 where the charge is for water or sewer capacity; otherwise the district's own enabling act (Health & Safety Code / Pub. Resources Code, by district type). Collected other: conflicting official statements — the ordinance says before building/use permit issuance; DSRSD (the Dublin collector) says within 30 days prior to setting the water meter.

What one house pays

$35,670

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot — this fee varies by the row that applies, so see the full schedule below.

Share of Dublin's total
24%
Total one-time fees here
$147,738
Adjustment
Does not adjust
what the document says

NONE stated in the rate schedule

The record

Why it exists

“In order to apportion more fairly the costs of new facilities on the basis of benefits conferred upon the property within the area, the charges hereinbelow indicated are hereby established on all new connections to any water system which is directly connected to the Zone No. 7 water supply system, to be utilized to accomplish proposed improvement in the water treatment and delivery system.”

Ord. FC 72-1, Section I Declaration of Findings, as amended by Ord. FC 77-2 · source document ↗
What it pays for

“All charges collected under the provision of this Ordinance, and a portion of water sales revenues as deemed appropriate by the Zone Board, shall be deposited with the Treasurer of the District, said funds to be designated 'Zone 7 Water Facilities Fund.' Said funds shall be utilized for the accomplishment of proposed improvements to the Zone No. 7 water supply system, and shall be expended for administration, land acquisition, construction, engineering, repair, maintenance and operation, or reimbursement or retirement of bonded indebtedness incurred for same, in whole or in part, of the water supply facilities within Zone No. 7.”

Ord. FC 72-1, Section IV Disposition of Charges, as amended by Ord. FC 77-2 · source document ↗
Where it applies

“The Ordinance is applicable over the Zone 7 area that includes Livermore, Pleasanton, Dublin, Sunol, and surrounding communities.”

Water Connection Fee Information Sheet, effective June 16, 2026, §I.A · source document ↗
When it was adopted

1972-01-18

“Adopted by the Board of Supervisors of the Alameda County Flood Control and Water Conservation District on this 18th day of January, 1972”

Study Report: FY 2016/17 Municipal & Industrial Connection Fee Program Update, NBS, February 2017 — Appendix B, "ORDINANCE NO. FC 72-1, AS AMENDED BY ORDINANCES FC 77-2; FC 86-136; AND FC O-91-68 … AN ORDINANCE ADOPTED PURSUANT TO SECTION 12.1 OF THE ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ACT IMPOSING A WATER CONNECTION CHARGE IN ZONE NO. 7", Section XII Effective Date · source document ↗
Who adopted it

Ordinance No. FC 72-1 (as amended by Ordinances FC 77-2; FC 86-136; and FC O-91-68)

“Adopted by the Board of Supervisors of the Alameda County Flood Control and Water Conservation District on this 18th day of January, 1972”

Study Report: FY 2016/17 Municipal & Industrial Connection Fee Program Update, NBS, February 2017 — Appendix B, "ORDINANCE NO. FC 72-1, AS AMENDED BY ORDINANCES FC 77-2; FC 86-136; AND FC O-91-68 … AN ORDINANCE ADOPTED PURSUANT TO SECTION 12.1 OF THE ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT ACT IMPOSING A WATER CONNECTION CHARGE IN ZONE NO. 7", Section XII Effective Date · source document ↗
When it is paid

“Charges provided for herein shall be collected by the Zone, or the appropriate City Building Official if the improvement is located within an incorporated city, prior to the issuance of a building permit or a use permit for such improvement. In cases where permits are not required, payment of charges shall be made to the Zone or appropriate City Building Official prior to installation of a new connection.”

Ord. FC 72-1, Section V Collection of Charges, as amended by Ord. FC 77-2 · source document ↗
Who collects it

Dublin San Ramon Services District (DSRSD), as agent for Zone 7

“The water connection fees are collected by the Building Departments of the Cities of Livermore and Pleasanton, and by the Dublin San Ramon Services District, which are agents for Zone 7. For that area within the California Water service area which is located outside of the Livermore city limits, connection fees will be paid at the Zone 7 office in Livermore.”

Water Connection Fee Information Sheet, effective June 16, 2026, §II · source document ↗
Who is exempt

“No charge shall be collected for separate private fire service connections. Combined domestic and fire service connections shall be subject to the connection charge based on the meter size for the combined system, except the basic charge shall be collected for combined systems, up to a maximum one-inch (1") meter size, for single family and duplex housing units with fire sprinkler systems approved by the appropriate fire department and installed in accordance with applicable building requirements.”

Ord. FC 72-1, Section VI Exemptions ¶1, as amended by Ord. FC O-91-68 · source document ↗
Credits and offsets

“For increasing the meter size or capacity on any existing connection, a charge shall be imposed equal to the product of the basic charge in effect at the time the meter exchange is requested and the difference in the fee factor between the new meter and the existing meter. There shall be no refund of charges paid for decreasing the meter size or capacity.”

Ord. FC 72-1, Section III, as amended by Ord. FC O-91-68 · source document ↗
How it changes

“Proposed fees would initially be effective May 1, 2017, and then January 1st each year thereafter. Connection fees will be updated annually by the Engineering News-Record's construction cost index (ENR CCI) inflation factor (September – September).”

FY 2016/17 M&I Connection Fee Program Update, February 2017, Section 5, footnote 13 · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
Other 25 gpm capacity, fee factor 2.5 - Domestic Service column (1" displacement, unrestricted 5/8" iPerl or 5/8"x3/4" Kamstrup) per meter 16 Jun 2026 $89,175
the line this rate was read from

“Zone 7 M&I Connection Fee Rate Schedule, Effective June 16, 2026 - Meter Size | Type | Capacity gpm | Domestic Fee Factor / Fee | Combined Fee Factor / Fee: 1" | DISPLACEMENT TYPE | 25 | 2.5 | $89,175 | 1.0 | $35,670 ... 5/8" | IPERL ELECTROMAGNETIC | 25 | 2.5 | $89,175 | 1.0 | $35,670 ... 5/8" X 3/4" | KAMSTRUP ULTRASONIC | 25 | 2.5 | $89,175 | 1.0 | $35,670 ... 1" | DIEHL / KAMSTRUP / IPERL | 55 | 5.5 | $196,185 | 4.0 | $142,680 [footnote 2] Fee factors are based on the recommended maximum continuous flow rate for that meter, which is the manufacturer-specified maximum flow rate for non-displacement type meters.”

zone7waterca.gov · source document ↗
Single-family detached 5/8 inch meter, 10 gpm capacity, fee factor 1.0this home per meter 16 Jun 2026 $35,670

“Zone 7 M&I Connection Fee Rate Schedule, Effective June 16, 2026 - Meter Size | Type | Capacity gpm | Domestic Fee Factor / Fee | Combined Fee Factor / Fee: 5/8" | DISPLACEMENT TYPE | 10 | 1.0 | $35,670 | N/A ... 5/8" | IPERL ELECTROMAGNETIC WITH 10 GPM RESTRICTION | 10 | 1.0 | $35,670 | N/A ... 1" | DISPLACEMENT TYPE | 25 | 2.5 | $89,175 | 1.0 | $35,670 [footnote 3] Zone 7's fire-service exemption applies to combined domestic and fire service connections up to a maximum one-inch (1") meter size. The exemption only applies to single family and duplex housing units with fire sprinkler systems approved by the appropriate fire department and installed in accordance with applicable building requirements. For all exempt meters, Zone 7 determines the fee factor by subtracting 15 gpm from the meter's maximum continuous flow rate, then dividing the total by 10 gpm. The fire-service exemption does not apply to meters with a capacity less than 25 gpm.”

zone7waterca.gov · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.