EID Wastewater Facility Capacity Charge

Levied by El Dorado Irrigation District on new development in El Dorado County (unincorporated). Authorized under the Gov. Code Sec. 66013 (capacity charge for water or sewer service). Collected other: at purchase of the service connection (meter/connection) from EID — no document found tying it to the County building permit.

What one house pays

$14,377

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of El Dorado County (unincorporated)'s total
13%
Total one-time fees here
$114,005
Adjustment
Adjusts yearly · ENR construction cost index · January
what the document says

ENR-CCI annual

Next expected change
1 Jan 2027

The record

Why it exists

“FCCs are necessary to ensure that existing users are not unfairly burdened by costs incurred to provide capacity to new users." and "The underlying principle is that 'growth shall pay for growth.'”

EID 2024 Facility Capacity Charges Update Study, Water Resources Economics LLC, September 12, 2024, Introduction · source document ↗
What it pays for

“Wastewater FCCs include both a 'Buy-in component' and an 'Incremental Cost component.'" / "The Buy-in cost basis represents the value of the existing system that the new user is buying into" / "The Incremental cost basis reflects future capital spending required to expand system capacity to accommodate new users.”

2024 FCC Update Study, Section 4, Wastewater FCCs · source document ↗
Where it applies

“El Dorado Irrigation District (referred to herein as the District) is a special district that provides potable water, wastewater, and recycled water services to a population of about 130,000 within a 220 square mile service area in El Dorado County." and "Wastewater Buy-in units of service are based on the number of current EDUs connected to the District's wastewater system.”

2024 FCC Update Study, Sections 1 and 4 · source document ↗
When it was adopted

2024-09-23 (amended 2024-11-12; adopted charges effective 2025-01-01, escalated annually)

“Consider adopting a resolution to approve the facility capacity charges recommended by the 2024 Facility Capacity Charges Update Study." / "Adopted Resolution No. 2024-025 to approve the facility capacity charges recommended by the 2024 Facility Capacity Charges Update Study.”

EID Board of Directors Minutes, Regular Board Meeting, 09/23/2024, Item 4, Public Hearing; "Ayes: Directors Dwyer, Anzini, Veerkamp, Osborne, and Day" · source document ↗
Who adopted it

Resolution No. 2024-025 (amended by Resolution No. 2024-032)

“Consider adopting a resolution to approve the facility capacity charges recommended by the 2024 Facility Capacity Charges Update Study." / "Adopted Resolution No. 2024-025 to approve the facility capacity charges recommended by the 2024 Facility Capacity Charges Update Study.”

EID Board of Directors Minutes, Regular Board Meeting, 09/23/2024, Item 4, Public Hearing; "Ayes: Directors Dwyer, Anzini, Veerkamp, Osborne, and Day" · source document ↗
When it is paid

“a meter may be purchased by paying the corresponding Facility Capacity Charges (FCC's) and any additional related costs.”

EID Development Services – Agricultural, undated · source document ↗
Who collects it

El Dorado Irrigation District, the agency that levies it

“EL DORADO IRRIGATION DISTRICT Facility Capacity Charges (FCCs) and Fees" / "PLEASE CONTACT EID DEVELOPMENT SERVICES TO VERIFY THE VALUE OF YOUR WATER METER AT [email protected] OR (530) 642-4028.”

EID Facility Capacity Charges (FCCs) and Fees, "Revised : 11/19/2025 Effective: 1/1/2026" · source document ↗
Who is exempt

“In accordance with Senate Bill No. 229 and El Dorado County ordinance, effective January 1, 2018, no additional Facility Capacity Charge (FCC) will be incurred for the addition of a second dwelling on a residential parcel.”

EID, New Development – General Information, "Second Dwelling/Granny Flat" · source document ↗
Credits and offsets

“Facility Capacity Charges (FCCs) or connection fees for multi-family developments (sharing a common wall) are based on the number of units rather than the meter size, and will receive a 25% discount on the connection fees in place at the time of purchase.”

How it changes

“Since 2013, the District has increased its adopted FCCs annually in proportion to changes in the Engineering News-Record's 20-city national average Construction Cost Index (CCI)." and "Therefore, the District may apply annual CCI adjustments to the proposed FCCs beginning January 1, 2025, and each year thereafter.”

2024 FCC Update Study, Sept. 12, 2024 · source document ↗

Every published rate

Every rate below applies to single-family detached.

Applies toBasisEffectiveAmount
3/4"this home per connection 1 Jan 2026 $14,377

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close