The record
“to repeal various fees associated with providing water capacity for new and expanded connections to the water system and create a new Water Capacity Fee classification, and to adopt Water Capacity Fees as proposed by and justified in the nexus study prepared by Bartle Wells Associates.”
“A water capacity fee shall be required for all water service connections to the City water system, except for connections solely for fire protection.”
2017-04-13
“ADOPTED" / "The above item was approved on the Consent Calendar with Councilmember Bredefeld voting "no."" / "Pass" / "2017-04-13T13:30:00”
“ADOPTED" / "The above item was approved on the Consent Calendar with Councilmember Bredefeld voting "no."" / "Pass" / "2017-04-13T13:30:00”
“A water capacity fee shall be required for all water service connections to the City water system, except for connections solely for fire protection. The amount of the fee for each water service shall be determined by meter size as designated in the Master Fee Resolution.”
City of Fresno, Department of Public Utilities, the agency that levies it
“CITY OF FRESNO MASTER FEE SCHEDULE / PUBLIC UTILITIES DEPARTMENT / WATER CONNECTION CHARGES (FMC 6-507)”
“A water capacity fee shall be required for all water service connections to the City water system, except for connections solely for fire protection.”
“If the use of a property, lot, parcel, or premise changes, and a larger service connection and meter are required to serve the new uses on the property, the water capacity fee obligation shall be based upon the incremental difference in cost between the water capacity fee charge for the larger meter size and the water capacity fee charge for the existing meter size, or the existing meter size may be estimated based upon the 10-year historical average water use on the property, whichever is less. No water capacity fee credit will be owed by the City when the new meter size is smaller than the prior meter size or the estimated meter size.”
“** 530th Master Fee Schedule Amendment effective upon effective date of the Water Capacity Charge Ordinance.”
Every published rate
Every rate below applies to single-family detached.
| Applies to | Basis | Effective | Amount |
|---|---|---|---|
| — | |||
| 3/4" meterthis home | per connection | 1 Jul 2026 | $3,553 |
FY 2023 City of Fresno Development Impact Charge & Fee Summary, page 2, "WATER CONNECTION CHARGES", item j, parenthesised "(Core Areas/Infill)" column · source document ↗
| |||
| Core Areas/Infill | |||
| 3/4" meter | per connection | 1 Jul 2018 | $1,776 |
the line this rate was read from
FY 2023 City of Fresno Development Impact Charge & Fee Summary, page 2, "WATER CONNECTION CHARGES", item j, parenthesised "(Core Areas/Infill)" column · source document ↗
| |||