Levied by Rubidoux Community Services District on new development in Jurupa Valley. Authorized under the Gov. Code Sec. 66013 where the charge is for water or sewer capacity; otherwise the district's own enabling act (Health & Safety Code / Pub. Resources Code, by district type). Collected other: prior to District approval of water, sewer and/or fire sprinkler improvement drawings, with connection fees timed just prior to occupancy.

What one house pays

$7,300

This fee is not in Jurupa Valley's published figure. This site publishes a home outside any plan area, and this charge applies only in Rubidoux CSD. The amount shown is what it costs a house that is there.

Total one-time fees here
$66,486
Adjustment
Not recorded

The record

Why it exists

“The District's Capital Improvement Projects (CIP) and their value represent what is needed for the District to meet system demand for water and sewer capacity to complete system build out … CIP costs are used to determine Connection and Capacity Fees for new construction projects to join into the District's Water and Sewer Systems.”

RCSD, "Water Master Plan and Wastewater Master Plans - May 2022" · source document ↗
What it pays for

“COMPONENT LIST, verbatim from the fee sheet — "Rubidoux Community Services District / Capacity Fees"; columns and rows as published: • "Water Meter Size | EDU's | FLOW RATE | MAX FIRE FLOW" — "3/4" | 1.00 | 15 gpm | 30 gpm" (through 10" = 80.00 EDUs) • "Water Meter Size | Water Capacity Fees" — "3/4" | $6,800" ; "1" | $11,356" ; "1 1/2" | $22,644" ; "2" | $36,244" ; "3" | $68,000" ; "4" | $113,356" ; "6" | $226,644" ; "8" | $362,644" ; "10" | $544,000" • "Water Meter Size | Water Meter Fees" — "3/4" | $500" ; "1" | $570" ; "1 1/2" | $870" ; "2" | $1,120" ; "3"–10" | Actual Cost" • "Sewer Capacity Fees" — "EDU (300 gallons per day) = $5, 200" ; "(Based on water meter size)" ; "1 EDU Minimum" • "Fire Mitigation" — "Residential= $815.00/ unit" ; "Commercial= $0.41/sqft”

RCSD, "Capacity Fees" fee sheet; no date or adopting instrument printed on the document · source document ↗
Where it applies

“The District's primary service area is within the City of Jurupa Valley and approximately 128 acres in San Bernardino County. The District is bounded by San Bernardino County on the north, the Jurupa Mountains and Pedley Hills on the northwest, City of Jurupa Valley areas on the west, the Santa Ana River on the south and the City of Riverside on the east. The District's current boundaries encompass an area of approximately 7.7 square miles and serves an estimated population of 35,000.”

Riverside LAFCO 2021 CSD MSR/SOI, adopted 10-28-2021, Ch. 4, p.70 · source document ↗
When it is paid

“Payment of all fees and deposits must be received prior to District approval of water, sewer, and/or fire sprinkler improvement drawings. Payment of connection fees will be timed to be just prior to occupancy.”

Rubidoux Community Services District, Water and Sewer "Will-Serve Letter", 15 December 2022, on RCSD letterhead signed by Yvonne Reyes, Assistant Engineer · source document ↗
Who collects it

Rubidoux Community Services District, the agency that levies it

“Payment of the District capacity, plan check and inspection fees for water, sewer, and fire mitigation. ALL FEES AND DEPOSITS ARE DUE PAYABLE DIRECTLY TO THE DISTRICT OFFICE.”

RCSD Will-Serve Letter, 12/15/2022, item 1, p.1 · source document ↗

Every published rate

Every rate below applies to single-family detached.

ComponentBasisEffectiveAmount
3/4 inch (standard SFD) per meter 1 Jan 2026 $6,800
3/4 inch per meter 1 Jan 2026 $500.00

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.