TransportationSet by plan area feeCitation LAMC 19.19

Westside Mobility Transportation Impact Assessment (TIA) Fee

Levied by City of Los Angeles — Department of Transportation (LADOT), fee adopted by City Council ordinance on new development in Los Angeles. Authorized under the Mitigation Fee Act - Gov. Code Sec. 66000 et seq. (specific plan area fee). Collected other: TIA Fees fully paid prior to issuance of the first LADBS permit; for residential uses payment may be made at issuance of the certificate of occupancy.

What one house pays

$8,847

This fee is not in Los Angeles's published figure. This site publishes a home outside any plan area, and this charge applies only in Westside Mobility area. The amount shown is what it costs a house that is there.

Total one-time fees here
$30,426
Adjustment
Adjusts yearly · ENR construction cost index · January
what the document says

Construction Cost Index; revised rates published by January 31 each year

Next expected change
1 Jan 2027 rate on file is stale
!

A scheduled adjustment has passed since this rate took effect

This fee escalates annually. The rate on file is effective 8 Jul 2019, and at least one adjustment has fallen due since. The current amount is probably different, and for an indexed fee almost certainly higher. The next change after that is expected 1 Jan 2027.

The figure is published as held rather than projected forward, because a number computed from an index is not a number quoted from an adopted schedule. It is flagged so you can check the agency's current schedule before relying on it.

The record

Why it exists

“PURPOSE OF FEES: The purpose of the Transportation Impact Assessment Fee (TIA Fee) program is to provide funding mechanisms to help the City reduce vehicle miles traveled (VMT) per capita on the Westside by providing partial funding for multi-modal transportation improvements as identified through the Westside Mobility Plan Study process and consistent with the City's General Plan Circulation Element (Mobility Plan 2035) and General Plan Land Use Element (the Community Plans).”

Ordinance No. 186,105, adopted 04/30/2019, recitals, Mitigation Fee Act finding (1); PDF p. 32 · source document ↗
What it pays for

“USE OF FEES: The TIA Fee program revenues from new development will be used to fund transportation improvements that reduce VMT per capita, enhance multimodal connectivity, and increase transportation options on the Westside. Transportation improvements that have been identified for TIA Fee funding include active transportation projects including new or enhanced bicycle and pedestrian facilities; new dedicated transit routes; extensions to current transit routes or enhancements to current transit service; roadway and ITS improvements; and trip reduction programs.”

Ordinance No. 186,105, adopted 04/30/2019, recitals, Mitigation Fee Act finding (2); PDF p. 32 · source document ↗
Where it applies

“SEC. 19.19. WESTSIDE MOBILITY TRANSPORTATION FEES A. Purpose. This ordinance is intended to adopt the Transportation Improvement Assessment Fee (TIA Fee), TIA Fee Credits, TIA Fee exemptions, and TIA Fee Improvement list authorized in the West Los Angeles Transportation Improvement and Mitigation Specific Plan (WLA TIMP) and the Coastal Transportation Corridor Specific Plan (CTCSP)." ... "The Specific Plan establishes a transportation mitigation program which shall be applicable to all lots located in whole or in part within the Specific Plan Area. B. Specific Plan Area. The Specific Plan Area (plan area) includes those areas of the City of Los Angeles shown in the shaded area of Map 1.”

Ord. 186,105 LAMC s. 19.19.A, PDF p. 35; and CTCSP Section 1.A-B, Ord. 186,104 eff. 06/28/2019, PDF p. 7 · source document ↗
When it was adopted

2019-04-30 (adopted); effective 2019-06-28

“Ordinance No. 186105 - a copy of which is hereto attached, was finally adopted by the Los Angeles City Council on 04/30/2019 ... Ordinance Effective Date: JUN 2 8 2019 / Council File No.: 07-0287,08-0229”

Declaration of Posting Ordinance, Ord. No. 186105, Deputy Clerk dated 05/09/2019; PDF p. 47 · source document ↗
Who adopted it

“Ordinance No. 186105 - a copy of which is hereto attached, was finally adopted by the Los Angeles City Council on 04/30/2019 ... Ordinance Effective Date: JUN 2 8 2019 / Council File No.: 07-0287,08-0229”

Declaration of Posting Ordinance, Ord. No. 186105, Deputy Clerk dated 05/09/2019; PDF p. 47 · source document ↗
When it is paid

“Time of Payment. Unless otherwise provided in the Fee Ordinance, the timing and method of TIA Fee payments shall be as provided below. 1. General Rule. TIA Fees shall be fully paid prior to issuance of the first permit by LADBS, subject to the following exceptions: a. Residential Uses. If the TIA Fees are for a residential use, payment may be made at issuance of the certificate of occupancy.”

Coastal Transportation Corridor Specific Plan, eff. 06/28/2019, Section 7.C; PDF p. 17 · source document ↗
Who collects it

“Project Requirements. Project applicants are required to pay TIA Fees as calculated by LADOT." ... "General Requirement. No permit shall be issued by LADBS for any Project unless the applicant has done all of the following: ... 2. Paid the TIA Fee required, if any, pursuant to Section 7 of this Specific Plan.”

Coastal Transportation Corridor Specific Plan, eff. 06/28/2019, Sections 7.B and 5.A; PDF pp. 17 and 14 · source document ↗
Who is exempt

“TIA Fee Exemptions. The following Projects shall be exempt from payment of a TIA Fee: a. Any Project exempt from the requirements of the CTCSP or WLA TIMP pursuant to Section 5.B in the applicable Specific Plan; b. Affordable Dwelling Units, if they meet the criteria in Subsection 8.B.2.b of the CTCSP and the WLA TIMP; c. One hundred percent affordable housing projects ... d. Projects providing housing or services for persons experiencing homelessness ... e. Accessory dwelling units to single family homes, commonly referred to as 'granny flats;' f. Educational institutions, public and private; g. Child Care Facilities as defined by LAMC Section 12.03; h. Churches, Temples, and other buildings used for assembly ... i. Hospitals ... j. Eldercare Facilities, as defined in LAMC Section 12.03; k. Park and Ride Facilities; l. Temporary uses of less than six months in duration ... m. Governmental or Public Facilities ... n. Projects on property owned by LAWA and used for aircraft operations”

Ordinance No. 186,105, LAMC s. 19.19.D.1, adopted 04/30/2019; PDF pp. 39-40 · source document ↗
Credits and offsets

“Existing Land Use Credit. ... (c) If the existing use was active for at least six consecutive months during the past two years prior to submittal of plans to LADBS pursuant to LAMC Section 12.26 A.3, a 100 percent credit will be granted for the existing use ... (d) If the existing use was active for at least six consecutive months during the past four years ... a 50 percent credit will be granted for the previous use ... b. Affordable Housing Credit. ... Credits shall be granted for each Affordable Dwelling Unit in an amount equal to the fee for two Apartment units ... ii. Maximum Credits. In no case shall the Affordable Housing Fee Credit exceed 50 percent of the TIA Fee for a Project. c. Transit Oriented Development Credit. ... i. A Project on a parcel within one-half mile of a transit station or stop serving a Dedicated Transit Line is eligible for a five percent Fee Credit; or ii. A Project with a pedestrian entrance within one-quarter mile walking distance to a transit station or stop serving a Dedicated Transit Line is eligible for a 10 percent fee credit. ... d. No Credit for Administrative Costs. Notwithstanding the above, no credit shall be granted for that portion of the TIA Fee for the administrative costs of the TIA Fee program (five percent of total fee).”

Ordinance No. 186,105, LAMC s. 19.19.D.3, adopted 04/30/2019; PDF pp. 41-42 · source document ↗
How it changes

“Phased Implementation of the Residential TIA Fee. The TIA Fee for Residential Land Uses (as those uses are defined in the TIA Fee Table), shall be phased based on when the Project plans are submitted to the Los Angeles Department of Building and Safety (LADBS) pursuant to Section 12.26 A.3 of this Code: a. For Projects with plans submitted within the first 120 days following the effective date of the ordinance, no TIA Fee for Residential Land Uses shall be paid. b. For Projects with plans submitted between 121 and 305 days following the effective date of the ordinance, one-third of the TIA Fee for Residential Land Uses (based on the fee schedule in effect at the time the plans are submitted) shall be imposed. c. For Projects with plans submitted between 306 and 484 days following the effective date of the ordinance, two-thirds of the TIA Fee for Residential Land Uses (based on the fee schedule in effect at the time the plans are submitted) shall be paid. d. For Projects with plans submitted 485 or more days following the effective date of the ordinance, the full TIA Fee for Residential Land Uses (based on the fee schedule in effect at the time the plans are submitted) shall be paid.”

Ordinance No. 186,105, LAMC s. 19.19.C.3, adopted 04/30/2019; PDF p. 38 · source document ↗

Every published rate

Land useHouse sizeBasisEffectiveAmount
Westside Mobility area (CTCSP / WLA TIMP)
Office =< 50,000 SF 50,000 SF or smaller 1,000 SF — $25,000
the line this rate was read from

“Office =< 50,000 SF | 1,000 SF | $25,000 | A building of 50,000 SF or smaller with office uses, including those with multiple tenants.”

the levying document · source document ↗
Retail >800,000 SF more than 800,000 SF 1,000 SF — $16,897
the line this rate was read from

“Retail >800,000 SF | 1,000 SF | $16,897 | More than 800,000 SF of general retail uses, as defined above based on total square footage of retail uses on site.”

the levying document · source document ↗
Office > 250,000 SF greater than 250,000 SF 1,000 SF — $16,754
the line this rate was read from

“Office> 250,000 SF | 1,000 SF | $16,754 | Buildings greater than 250,000 SF for office uses (as defined above).”

the levying document · source document ↗
Retail =< 250,000 SF 250,000 SF or less 1,000 SF — $13,347
the line this rate was read from

“Retail =< 250,000 SF | 1,000 SF | $13,347 | Less than or equal to 250,000 SF of general retail uses, based on total square footage of retail uses on site.”

the levying document · source document ↗
Industrial none 1,000 SF — $10,975
the line this rate was read from

“Industrial | 1,000 SF | $10,975 | Facility that includes a mixture of two or more of the following: manufacturing, service facilities, or warehouse facilities.”

the levying document · source document ↗
Manufacturing none 1,000 SF — $9,426
the line this rate was read from

“Manufacturing | 1,000 SF | $9,426 | Facility that is primarily devoted to the conversion of raw materials or parts into finished products; may include ancillary warehouse, office and research related functions.”

the levying document · source document ↗
Cargo Facilities none 1,000 SF — $7,876
the line this rate was read from

“Cargo Facilities | 1,000 SF | $7,876 | Cargo facilities associated with aviation uses on or adjacent to the LAX airport.”

the levying document · source document ↗
Hotel none Room — $5,452
the line this rate was read from

“Hotel | Room | $5,452 | A use that provides sleeping accommodations and supporting facilities for short-term occupancy.”

the levying document · source document ↗
Warehouse none 1,000 SF — $4,132
the line this rate was read from

“Warehouse | 1,000 SF | $4,132 | Facility that is primarily devoted to the storage of materials; including ancillary office and maintenance related functions.”

the levying document · source document ↗
Mini-Warehouse none 1,000 SF — $3,357
the line this rate was read from

“Mini-Warehouse | 1,000 SF | $3,357 | Self-storage facilities in which a number of storage units/vaults are rented for the storage of goods, including ancillary office and maintenance-related functions.”

the levying document · source document ↗
Maintenance Facilities none 1,000 SF — $2,195
the line this rate was read from

“Maintenance Facilities | 1,000 SF | $2,195 | Maintenance facilities associated with aviation uses on or adjacent to the LAX airport.”

the levying document · source document ↗
Westside Mobility area
Single-family detached per DU 8 Jul 2019 $8,847
the line this rate was read from

“Single Family | DU | $8,847 | Single family detached homes on individual lots, including homes created though Small Lot Subdivisions.”

Ordinance No. 186,105, LAMC s. 19.19.C.1.a, "TIA Fee Table", Residential Land Uses, adopted 04/30/2019; PDF p. 36 · source document ↗
Multi-family condo/townhouse per DU 8 Jul 2019 $6,248
the line this rate was read from

“Condominium / Townhouse | DU | $6,248 | Multi-family units with individual ownership in buildings 10 stories or less.”

Ordinance No. 186,105, LAMC s. 19.19.C.1.a, "TIA Fee Table", Residential Land Uses, adopted 04/30/2019; PDF p. 36 · source document ↗
Multi-family apartment per DU 8 Jul 2019 $4,646
the line this rate was read from

“Apartment | DU | $4,646 | Multi-family rental units in a building 10 stories or less.”

Ordinance No. 186,105, LAMC s. 19.19.C.1.a, "TIA Fee Table", Residential Land Uses, adopted 04/30/2019; PDF p. 36 · source document ↗
Multi-family high-rise condo per DU 8 Jul 2019 $3,044
the line this rate was read from

“High-Rise Condominium / Townhouse | DU | $3,044 | Multi-family units with individual ownership in buildings more than 10 stories.”

Ordinance No. 186,105, LAMC s. 19.19.C.1.a, "TIA Fee Table", Residential Land Uses, adopted 04/30/2019; PDF p. 36 · source document ↗
Multi-family high-rise apartment per DU 8 Jul 2019 $2,804
the line this rate was read from

“High Rise Apartment | DU | $2,804 | Multi-family rental units in a building with more than 10 stories.”

Ordinance No. 186,105, LAMC s. 19.19.C.1.a, "TIA Fee Table", Residential Land Uses, adopted 04/30/2019; PDF p. 36 · source document ↗
Multi-family affordable DU per DU 8 Jul 2019 $0.00
the line this rate was read from

“Affordable Dwelling Unit | DU | $0 | Affordable Dwelling Unit as defined in Section 4 of the WLA TIMP and the CTCSP.”

Ordinance No. 186,105, LAMC s. 19.19.C.1.a, "TIA Fee Table", Residential Land Uses, adopted 04/30/2019; PDF p. 36 · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.