DevFeeFinder
TransportationSet by regional JPA feeCitation TransNet Extension Ordinance

SANDAG Regional Transportation Congestion Improvement Program (RTCIP)

Levied by SANDAG / San Diego County Regional Transportation Commission (TransNet Extension Ordinance, Commission Ordinance 04-01) on new development in San Diego County (unincorporated). Authorized under the Mitigation Fee Act - Gov. Code Sec. 66000 et seq., adopted by each member agency; the JPA itself under Gov. Code Sec. 6500 et seq. Collected other: the program's nexus study anticipates collection at building permit issuance but states it as a likelihood for local agencies, not as a requirement; no reachable County of San Diego instrument was read on this point.

What one house pays

$3,110

For a typical home: a 2,000 sq ft detached house on a 0.13 acre lot, on a new subdivision lot.

Share of San Diego County (unincorporated)'s total
4%
Total one-time fees here
$68,467
Adjustment
Adjusts yearly · ENR construction cost index · February
what the document says

ENR CCI with a 2% annual floor; SANDAG Board sets it each February for the following July

Next expected change
1 Feb 2027

The record

Why it exists

“In addition to the sales tax extension, the TransNet program requires implementation of a new local funding source for the draft 2007 RTP, the Regional Transportation Congestion Improvement Program (RTCIP).5 The purpose of the RTCIP is to ensure that new development directly invests in the region's transportation system to offset the negative impacts of growth on congestion and mobility.”

RTCIP Impact Fee Nexus Study – Final Report, 26 November 2007, ch. 1 "New Development Investments in Regional Transportation", p. 2 · source document ↗
What it pays for

“The RTCIP revenue will be used to construct improvements on the Regional Arterial System such as new or widened arterials, traffic signal coordination and other traffic improvements, freeway interchange and related freeway improvements, railroad grade separations, and improvements required for regional express bus and rail transit.”

Amended and Restated TransNet Extension Ordinance and Expenditure Plan, Commission Ordinance 04-01, SECTION 9(A) "New Development Exactions", p. 13 · source document ↗
Where it applies

“Starting on July 1, 2008, each local agency in the San Diego region shall contribute $2,000 in exactions from the private sector, for each newly constructed residential housing unit in that jurisdiction to the RTCIP.”

Amended and Restated TransNet Extension Ordinance and Expenditure Plan, Commission Ordinance 04-01, SECTION 9(A), p. 13 · source document ↗
When it was adopted

2004-05-28

“PASSED AND ADOPTED by the San Diego County Regional Transportation Commission, the 28th day of May, 2004 by the following vote: AYES: Commissioners Hall, Padilla, Monroe, Crawford, Lewis, Guerin, Holt Pfeiler, McCoy, Jantz, Sessom, Morrison, Feller, Cafagna, Murphy, Smith, Dale, Powell, Vance, NOES: Commissioner Jacob ABSENT: None ... Amended: December 2006, May 2008, July 2009, November 2009, March 2012, March 2017, February 2019, and May 2021.”

Amended and Restated TransNet Extension Ordinance and Expenditure Plan, Commission Ordinance 04-01, adopted 28 May 2004, signature/certification page, p. 16, with the amendment footer · source document ↗
Who adopted it

Commission Ordinance 04-01 (San Diego County Regional Transportation Commission); RTCIP exactions operative 2008-07-01

“PASSED AND ADOPTED by the San Diego County Regional Transportation Commission, the 28th day of May, 2004 by the following vote: AYES: Commissioners Hall, Padilla, Monroe, Crawford, Lewis, Guerin, Holt Pfeiler, McCoy, Jantz, Sessom, Morrison, Feller, Cafagna, Murphy, Smith, Dale, Powell, Vance, NOES: Commissioner Jacob ABSENT: None ... Amended: December 2006, May 2008, July 2009, November 2009, March 2012, March 2017, February 2019, and May 2021.”

Amended and Restated TransNet Extension Ordinance and Expenditure Plan, Commission Ordinance 04-01, adopted 28 May 2004, signature/certification page, p. 16, with the amendment footer · source document ↗
When it is paid

“Although the RTCIP does not specify a revenue source for this contribution, most local agencies are likely to collect this revenue as a development impact fee imposed on new dwelling units at building permit issuance.”

RTCIP Impact Fee Nexus Study – Final Report, 26 November 2007, ch. 1, "Key components of the RTCIP include:", p. 2 · source document ↗
Who collects it

County of San Diego (each local agency collects within its own jurisdiction)

“Each local agency shall establish an impact fee or other revenue Funding Program by which it collects and funds its contribution to the RTCIP. Each local agency shall be responsible for establishing a procedure for providing its monetary contribution to the RTCIP.”

Amended and Restated TransNet Extension Ordinance and Expenditure Plan, Commission Ordinance 04-01, SECTION 9(A), p. 13 · source document ↗
Who is exempt

“New residential housing units constructed for extremely low, very-low, low, and moderate income households, as defined in California Health and Safety Code Sections 50105, 50106, 50079.5 and 50093, will be exempted from the $2,000 per unit contribution requirement.”

Amended and Restated TransNet Extension Ordinance and Expenditure Plan, Commission Ordinance 04-01, SECTION 9(A), p. 13 · source document ↗
How it changes

“To meet the requirements of the Act and the July 1, 2008 RTCIP deadline, local agencies will need to adopt the RTCIP impact fee by May 1, 2008. This allows for the sixty-day period required under California Government Code section 60017 of the Act between the date of adoption and the date the fee becomes effective.”

RTCIP Impact Fee Nexus Study – Final Report, 26 November 2007, ch. 3 Implementation, "Adoption Schedule", p. 22 · source document ↗

Every published rate

Every rate below applies to single-family detached.

RateBasisEffectiveAmount
this home per DU 1 Jul 2026 $3,110

“SANDAG RTCIP fee ($3,109.88 per residential unit). Subject to annual increase in accordance with TransNet cost-indexing provisions.”

County of San Diego - TIF Program Update, "FEE RATES FOR VILLAGE AREAS", "(Effective July 1, 2026)", sheet footer "FY2026-27 Village (Rounded, Values) / A — Page 1 of 11 — 5/15/2026"; footnote 1 to table caption "(A) Residential - Single-Family Detached ($ / unit)", column heading "SANDAG RTCIP Fee 1, 2", printed as "$3,109.88" against every COMMUNITY PLANNING AREA row label, e.g. "Alpine | South | $3,109.88" · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.