DevFeeFinder
TransportationSet by plan area feeCitation Folsom Municipal Code 3.120 (Ord. 1234, 2015)

Sacramento County Transportation Development

Levied by Sacramento County (fee established under Sacramento County Code Ch. 16.87) on new development in Folsom. Authorized under the Mitigation Fee Act - Gov. Code Sec. 66000 et seq. (specific plan area fee). Collected at building permit.

What one house pays

$9,301

This fee is not in Folsom's published figure. This site publishes a home outside any plan area, and this charge applies only in Folsom Plan Area. The amount shown is what it costs a house that is there.

Total one-time fees here
$69,319
Adjustment
Adjusts yearly · ENR construction cost index · July
what the document says

ENR-CCI annual

Next expected change
1 Jul 2027

The record

Why it exists

“The purpose of the SCTDF is to fund the construction of roadway and transit improvements needed to accommodate traffic and transit ridership generated by new land development allowed by the present County General Plan and land use zoning. Assessing a Development Fee is also a condition of receiving Measure "A" Transportation Sales Tax allocations.”

Sacramento County Department of Transportation, "Development Fees", section "Sacramento County Transportation Development Fee Program (SCTDF)", retrieved 2026-09-12 · source document ↗
What it pays for

“The Sacramento County transportation development fee is to fund a fair share contribution toward the improvements to roadway, transit, bikeway, walkway and other transportation facilities in Sacramento County that serve the Folsom plan area.”

Folsom Municipal Code s. 3.120.060(F), "The Sacramento County Transportation Development Fee" · source document ↗
Where it applies

“Impact Fees for Folsom Plan Area / Residential based on Zoning”

"FOLSOM PLAN AREA DEVELOPMENT IMPACT FEES AND PERMIT FEES", Effective July 1, 2026, sheet dated 7/21/2026, page 3, table caption in the upper-left stub of the table that carries row M · source document ↗
When it was adopted

2015

“(Ord. 1234 § 2 (part), 2015)”

Folsom Municipal Code Ch. 3.120, Folsom Plan Area Development Impact Fees, ordinance-history line at end of chapter; this host 403s the fetch layer and the text was read through a text mirror of that exact URL, so treat the history line as medium confidence · source document ↗
Who adopted it

Ordinance No. 1234

“(Ord. 1234 § 2 (part), 2015)”

Folsom Municipal Code Ch. 3.120, Folsom Plan Area Development Impact Fees, ordinance-history line at end of chapter; this host 403s the fetch layer and the text was read through a text mirror of that exact URL, so treat the history line as medium confidence · source document ↗
When it is paid

at building permit

“The developer of any new development in the Folsom plan area shall pay the FPA development impact fee at or prior to the issuance of any building permit for a structure which is subject to this chapter. The amount of the fee shall be the then-current amount at the time of the building permit issuance, and shall be paid on a building-permit-by-building-permit basis.”

Folsom Municipal Code s. 3.120.050, payment of fee · source document ↗
Who collects it

City of Folsom, Community Development Department

“City of Folsom / Community Development Department / 50 Natoma Street / Folsom, CA 95630 / 916-461-6200”

"FOLSOM PLAN AREA DEVELOPMENT IMPACT FEES AND PERMIT FEES", Effective July 1, 2026, page 1 masthead — the City publishes and collects this line on its own permit-fee sheet; the only line on the whole sheet marked otherwise is the struck-through sewer row noted below, "paid directly to the County" · source document ↗

Every published rate

Land useApplies toBasisEffectiveAmount
Folsom Plan Area
Single-family detached SFLD low density per DU 1 Jul 2026 $9,301
the line this rate was read from

“M Sac County Trans. Dev. $ 9,301”

"FOLSOM PLAN AREA DEVELOPMENT IMPACT FEES AND PERMIT FEES", Effective July 1, 2026, sheet dated 7/21/2026, page 3; table caption "Impact Fees for Folsom Plan Area / Residential based on Zoning"; column heading block above the amount reads "Zoning" then "Applied per Unit" then the column label "SFLD"; row label beside the amount is "M Sac County Trans. Dev." under the section heading "2. Stand Alone Fees"; the table's foot row reads "TOTAL PER UNIT $ 109,952" in the same SFLD column · source document ↗
Multi-family MLD (multifamily low density zoning column) per DU — $7,610
the line this rate was read from

“M Sac County Trans. Dev. $ 7,610”

the levying document · source document ↗
Multi-family MMD (multifamily medium density zoning column) per DU — $6,763
the line this rate was read from

“M Sac County Trans. Dev. $ 6,763”

the levying document · source document ↗
Multi-family MHD (multifamily high density zoning column) per DU — $6,344
the line this rate was read from

“M Sac County Trans. Dev. $ 6,344”

the levying document · source document ↗
Multi-family MU-R (mixed use residential zoning column) per DU — $5,919
the line this rate was read from

“M Sac County Trans. Dev. $ 5,919”

the levying document · source document ↗

About these figures

Quoted, not summarized. Every amount and fact on this page is copied from the official document it links to. If we couldn’t find something in a document, we leave it blank instead of guessing.

Before any discounts. Some fees offer credits, waivers or phase-ins. They’re listed above but not subtracted, because whether you qualify depends on your project.

Check the date. Fees change. This page shows what was in force on the date at the top, with a link to the document that set it, so you can confirm the current amount yourself. How all of this is put together.

↑↓ navigate↵ openesc close